• Latest News

    Made with Love by Zahirul Islam . Powered by Blogger.
    Wednesday, September 2, 2015

    Speed Frame Production Calculation


    Math: Calculate the TPI (twist per inch) produced on a simplex with diameter of front roller 28 mm and its rpm be 30. The rpm of flyer is 1000.
    Solution:
    math1
    Math: Calculate the TPI on simplex if the diameter of back roller is 15/16’’, rpm of B.R is 10, rpm of flyer is 1000 and draft is 6.
    Solution:
    math2
    Math: Find out the production/shift in lbs. of a simplex machine. (Assume necessary parameters).
    Solution:

    math4
    Math: Find out the production per shift of a modern speed frame at 85% efficiency to produce 1.5 hank roving. Assume necessary parameters.
    Solution:
    math5


    Speed Frame Production Calculation
    • Blogger Comments
    • Facebook Comments

    0 comments:

    Post a Comment

    Item Reviewed: Speed Frame Production Calculation Rating: 5 Reviewed By: Unknown
    Scroll to Top